NEC4
selected fill
Excavated or imported material chosen to a specification and placed above the bedding. It is a construction term, not a contract term.
Where you meet it
- Module 3: Ambiguities and inconsistenciesValid compensation events
NEC4
Excavated or imported material chosen to a specification and placed above the bedding. It is a construction term, not a contract term.