FIDIC 2017 · FIDIC 15.1
Notice to Correct
The Engineer's Notice requiring the Contractor to put right a failure to perform, within a reasonable time. Ignoring it can lead to termination.
Where you meet it
- Module 13: Termination and Exceptional EventsNEC4 vs FIDIC 2017