Waleed Tariq Academy

FIDIC 2017 · FIDIC 1.1.76

Specification

The Red Book document that specifies the Works, with any changes made under the contract. With the Drawings, it is the nearest match to the ECC Scope.

The contract's words

“the document entitled specification included in the Contract” (FIDIC 1.1.76)