Scope provided by the Contractor for its design
The Scope the Contractor writes for its own design, named in Contract Data part two. Changing it at the Contractor's request is not a compensation event.
Also written as
- Contractor's Scope
- Scope provided by the Contractor
Where you meet it
- Module 7: Scope and Site Information: drafting that avoids argumentContract Preparation
- Module 1: Does the instruction change the Scope?Valid compensation events · Free