FIDIC 2017 · FIDIC 1.1.64
Permanent Works
The works of a lasting nature that the Contractor builds and leaves for the Employer, as opposed to temporary works.
Where you meet it
- Module 6: Changing the workNEC4 vs FIDIC 2017
FIDIC 2017 · FIDIC 1.1.64
The works of a lasting nature that the Contractor builds and leaves for the Employer, as opposed to temporary works.