FIDIC 2017 · FIDIC 1.1.55
No-objection
The Engineer's statement that it has no objection to a Contractor's document, which may then be used. The Contractor stays fully responsible for it.
“the Engineer has no objection to the Contractor’s Documents” (FIDIC 1.1.55)
Also written as
- Notice of No-objection
Where you meet it
- Module 2: Starting out and the programmeNEC4 vs FIDIC 2017
- Module 10: Design, quality and testingNEC4 vs FIDIC 2017