NEC4 · ECC 27.3
instruction
A direction from the Project Manager or the Supervisor that the Contractor must obey if it follows the contract. A Scope change by instruction is usually a compensation event.
On the Aldermere project
On 1 June 2026 Dana instructed a flatter slope on the embankment.